Big steam and pneumatic hammers had been Employed in that venture. But after the independence of Bangladesh in 1971, the technology didn't moved forward. This pile is designed according to the actual size on the bored soil. So, loads of time and The cash is saved With this piling program. https://jasperduena.blogzag.com/76084356/little-known-facts-about-pile-foundation-design-bangladesh