Installation Overview Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a leading confectionery manufacturing site in York. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing process stability and delivering measurable reductions in both energy consumption and carbon footprint. https://isocialfans.com/story6260627/energy-efficient-400-kw-chiller-installation-delivers-50-000-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction