Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, implementing a purpose-built ventilation and climate control system built to comply with demanding hygiene and production criteria. The project encompassed the end-to-end implementation of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based https://socialdosa.com/story10604793/penmann-ltd-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2